Learn about the ongoing 公共工程 and 设施 repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Last Updated: 10/15/2024 Category: 巷道 当前阶段: Planning and Project Approval
Flamingo/Edgewater Widening
Charlotte Harbor CRA - Melbourne Street multi-use path
Last Updated: 10/14/2024 Category: 人行道上 当前阶段: Design Development
Construct pedestrian sidewalk on Melbourne Street from U.S. 41 to Harborview 路.
Charlotte Harbor CRA - Parmely Street road widening and sidewalk
Last Updated: 10/14/2024 Category: 巷道 当前阶段: Design Development
Reconstruct and widen Parmely Street from U.S. 41 to Bayshore 路.
Construct multi-use path on Parmely Street from U.S. 41 to Bayshore 路.
Cochran Boulevard at Veterans Boulevard Intersection Improvments
Last Updated: 10/14/2024 Category: 巷道 当前阶段: Design Development
The design and construction of new turn lanes and traffic signal modifications at Cochran Boulevard and Veterans Boulevard intersection.
Last Updated: 10/14/2024 Category: 巷道 当前阶段: Design Development
吉尔特 Blvd roadway reconstructionLast Updated: 10/14/2024 Category: 巷道 当前阶段: Design Development
Widen Kings Highway to a 4 lane divided roadwayPeachland Boulevard at Harbor Boulevard Intersection Improvments
Last Updated: 10/14/2024 Category: 巷道 Category: 人行道上 当前阶段: Design Development
The design and construction of new turn lanes and traffic signal modifications at the intersection of Peachland Boulevard and Harbor Boulevard.
Last Updated: 10/14/2024 Category: 巷道 当前阶段: Design Development
Sandhill Blvd WideningVeterans Boulevard Intersection Improvements
Last Updated: 10/14/2024 Category: 巷道 当前阶段: Design Development
The design and construction of new turn lanes and sidewalk modifications at various intersections along Veterans Boulevard.